Claimate dMRV
Vision / Roadmap · OpenTwin Hub illustrates the digital-twin direction for clAImate. It is not wired to live production data — the sealed evidence → hash → engine → VC path lives in the main platform.
All applications
Grid simulation & renewable integration

Energy & Power Systems

Model transmission networks, converter-based renewables, and storage. Steady-state to EMT-scale transients.

Open Workbench
Model catalogue
  • IEEE9Bus
  • Microgrid_PV_BESS
  • HVDC_LinkPointToPoint
  • WindFarm_400MW
Libraries
  • PowerSystems
  • Modelica.Electrical.PowerConverters
  • OpenIPSL
Outputs
  • Bus Voltage
  • Frequency Deviation
  • PV Output
  • State of Charge
Active Model
PV Rating
50 MW
Battery Storage
100 MWh
Load Demand
220 MW
Grid Frequency
50 Hz
Sample telemetry (mock)
Ready to simulate
Bus Voltage
Frequency Deviation
PV Output
State of Charge
Ready to build a twin?

Load a model in the Simulation Workbench, tune parameters, and export as an FMU for downstream tools.

© 2026 Cleteco Energy Ltd·Claimate — neutral dMRV infrastructure·Companies House 16773757
did:web:claimate.space
Illustrative demo — synthetic reference data. Not live customer or production data.