Willows Health · Leicester, UK · FY2026
Pilot · pending VVB

Willows Health — Portfolio Evidence Layer

Reconciled baseline, measurement and settlement across four Leicester sites

Leicester · 4 sites · FY2026
ISO 14064-3 compatible, aligned with GHG Protocol and NHS Greener NHS methodology.
Portfolio emissions
36.8
tCO₂e / yr
3 existing sites
Sites
4
3 existing + 1 planned anchor
Total floor area
~1,705
654 + 160 + 391 + ~500
Anchor projected
11.1
tCO₂e / yr
green
EDGE design planned

Leicester site map

Live basemap — green existing sites, teal planned anchor

Step through monthly performance for every pin on the Digital Twin tab.

Willows Medical Centre

Existing · 654 m²

EPC B (42)DEC C (52)18.2 tCO₂e/yr

Heatherbrook Surgery

Existing · 160 m²

EPC C (69)8.4 tCO₂e/yr

Clarendon Park Medical Centre

Existing · 391 m²

DEC C (52)10.2 tCO₂e/yr

Leicester New-Build Anchor

Planned new-build · 500 m²

11.1 tCO₂e/yrEDGE planned

EDGE design certification planned

Portfolio summary

SiteArea (m²)EPCDECAnnual tCO₂eStatus
Willows Medical Centre654B (42)C (52)18.2existing
Heatherbrook Surgery160C (69)8.4existing
Clarendon Park Medical Centre391C (52)10.2existing
Leicester New-Build Anchor50011.1planned

Certifications & methodology

ISO 14064-1ISO 14064-2ISO 14064-3IPMVPGHG ProtocolGreener NHSEDGE (planned)

Cleteco live engagements

Concurrent built-environment dMRV pilots — figures cross-referenced only where independently sourced.

Willows Health
Live pilot engagement
Leicester, UK
Built-environment dMRV across four GP / healthcare sites
This app
Somerset Greenways · CapitaLand
Live pilot engagement
Chennai, India
Cooling-as-a-Service / deep-retrofit M&V (IPMVP)
Assumptions & provenance
  • Emission factors: DESNZ 2025 adopted; DEFRA 2024 superseded; generic 0.233 kgCO₂e/kWh rejected.
  • Portfolio total 36.8 tCO₂e/yr covers three existing sites; anchor 11.1 tCO₂e/yr is a projected new-build figure excluded from the existing baseline.
  • ISO 14064-3 compatible, aligned with GHG Protocol and NHS Greener NHS methodology.
  • Figures are pilot inputs pending independent verification; not yet VVB-assured.