Claimate dMRV
Built Environment · Evidence Layer
Willows Health · Leicester, UK · FY2026
Pilot · pending VVB

Consolidated Financial Model

Portfolio investment, cashflow and funding sources

15-yr horizon
Total capex
£204,000
Blended payback
5.4
yrs
Portfolio IRR
14.2%
green
Lifetime tCO₂e abated
344
15-yr, all measures

Waterfall — annual cost → net position

15-year cumulative cashflow

Funding sources → measures → sites

Stacked-flow visual (Sankey-style)

Sources
Equity — £120k
Grant (BUS) — £16,500
Green Loan (structuring) — £80k
Measures
Heat pumps
Solar PV
Controls / BMS
Fabric
Sites
Willows Medical Centre
Heatherbrook Surgery
Clarendon Park
Anchor (new-build)

Carbon monetisation

Indicative — no carbon credits have been issued

Shadow price assumption
£85 / tCO₂e
Implied lifetime carbon value
£29,198
Indicative only. No carbon credits have been issued for this portfolio.

Anchor — EDGE uplift

Value uplift attributable to EDGE design certification (new-build anchor)

  • Energy savings vs baseline design: ≥ 20%
  • Water savings vs baseline design: ≥ 20%
  • Embodied-materials savings: ≥ 20%
  • Rental / valuation uplift: indicative

Certification is planned; uplift figures shown are design-stage projections.

Assumptions & provenance
  • Discount rate: 6% nominal.
  • Carbon price: £85/tCO₂e shadow price for illustration — not a market clearing price.
  • Grant income of £16,500 assumed in year 0 (BUS eligible ASHP measures).
  • No carbon credits have been issued for this portfolio; monetisation figures are indicative only.
  • Model is a pilot indicative view; not an investment recommendation.
  • Figures are pilot inputs pending independent verification; not yet VVB-assured.
© 2026 Cleteco Energy Ltd·Claimate — neutral dMRV infrastructure·Companies House 16773757
did:web:claimate.space
Illustrative demo — synthetic reference data. Not live customer or production data.