Claimate dMRV
Portfolio/Hydrogen

Mundra Green Hydrogen & Ammonia

Onboarding
Mundra, Gujarat, IN · GHCI / RFNBO · Registry target: GHCI + ISCC EU
AI recommendations
Grounded on this project's status, uncertainty, open anomalies, and connector coverage.
Claimate flags, never adjusts
Every anomaly cites the detector that fired, the metric watched, and the threshold breached. Only the verifier decides whether they change conclusions.
High
Hourly RE match dropped to 71% between 02:00–04:00 IST.
AN-5220 · 2026-03-14 04:15 · electrolyser meter EL-1 · I-REC hourly GO feed
Open
Why this fired
Two consecutive hours below the 95% hourly-matching floor — pack cannot claim Tier-1 GHCI without buffer.
Detector
Hourly temporal matching (EnergyTag)
Metric
matched_RE_MWh / consumed_MWh (per hour)
Threshold
any hour < 95% under GHCI Tier-1 rule
Observed
0.71 avg over 2 hours
Expected
≥ 0.95
Source
electrolyser meter EL-1 · I-REC hourly GO feed
© 2026 Cleteco Energy Ltd·Claimate — neutral dMRV infrastructure·Companies House 16773757
did:web:claimate.space
Illustrative demo — synthetic reference data. Not live customer or production data.