Claimate dMRV
Portfolio/Renewable

Kutch Solar + Granular GO

Sealed — Evidence Ready
Kutch, Gujarat, IN · GCC 202 — Renewable Energy · Registry target: I-REC / EnergyTag
AI recommendations
Grounded on this project's status, uncertainty, open anomalies, and connector coverage.
Methodology
GCC-202 v3.0
Sealed inputs · snapshot 2026-03-14T09:00:00+05:30
Generation_MWh
328,000
Grid EF (tCO2/MWh)
0.82
Hourly-match adjustment
0.87
Equation output
E_avoided = Generation × GridEF × match_factor
         = 328000 × 0.82 × 0.997
         ≈ 2,68,000 tCO2e / yr
base = 2,68,000 tCO2e
jitter = +0.000% (band ±2%)
seed = "mrv-2026-03-14"
result_hash =
Point estimate
2,68,000 tCO2e
run #0
Uncertainty band
±2%
jitter +0.00%
Run engine
GCC-202 v3.0

Deterministic — same seed always produces the same point estimate. Seeded jitter stays within the ±2% uncertainty band.

runs: 0
Methodology-as-code, reproducible by design
The engine is versioned and deterministic. Any change bumps the version tag; historical results remain reproducible from sealed inputs and the recorded seed.
© 2026 Cleteco Energy Ltd·Claimate — neutral dMRV infrastructure·Companies House 16773757
did:web:claimate.space
Illustrative demo — synthetic reference data. Not live customer or production data.