Kutch Solar + Granular GO
Sealed — Evidence ReadyKutch, Gujarat, IN · GCC 202 — Renewable Energy · Registry target: I-REC / EnergyTag
AI recommendations
Grounded on this project's status, uncertainty, open anomalies, and connector coverage.
Deduction waterfall
Breakdown
| Point estimate | 2,68,000 tCO2e |
| Uncertainty band | ±2% (5,360 tCO2e) |
| Conservative deduction | − 2,680 |
| Leakage | − 5,360 |
| Nature buffer | n/a |
| Net creditable | 2,59,960 tCO2e |
Conservative by design
Claimate flags uncertainty transparently and applies conservative deductions. Verifiers may tighten further.